3-5 Weeks
6-8 Weeks
10-12 Weeks
20 Weeks
NOTE: Ship times are for standard powder coat colors. Add 4 weeks for galvanized-only and 8 weeks for powder-over-galvanized finishes to the times above.
Updated as of 11/6/2026
United Lighting Standards has been committed to designing, fabricating, finishing, and packaging high-quality steel and aluminum poles since 1971. We adhere to standards set forth by AASHTO, ASTM International, and NEMA. All of our products are built using fabricating and welding procedures outlined in the American Welding Society (AWS) manual for steel and aluminum to eliminate welding defects and ensure structural integrity.
Read more about ULS