Current Lead Times

2-3 Weeks

Bracket-Only Orders

3-5 Weeks

Straight Steel & Aluminum

6-8 Weeks

Tapered Steel

10-12 Weeks

Tapered Aluminum

20 Weeks

NOTE: Ship times are for standard powder coat colors. Add 4 weeks for galvanized-only and 8 weeks for powder-over-galvanized finishes to the times above.
Updated as of 11/6/2026

About Us

United Lighting Standards has been committed to designing, fabricating, finishing, and packaging high-quality steel and aluminum poles since 1971. We adhere to standards set forth by AASHTO, ASTM International, and NEMA. All of our products are built using fabricating and welding procedures outlined in the American Welding Society (AWS) manual for steel and aluminum to eliminate welding defects and ensure structural integrity.

Read more about ULS