While our products are fairly straightforward to assemble, there are times when having detailed instructions are helpful. Please use the following instruction sheets to support field assembly and installation.
There are certain steps you must go through once our poles have reached the job site. This document summarizes delivery, handling, and storage procedures that should be taken.
This document explains the necessary steps to properly install an anchor-based pole.
Our poles come with a lot of parts and pieces that are important during installation. This document takes you through what these pieces are and where they go.
Aeolian vibration can be detrimental to poles. These instructions show how to install a vibration dampener to mitigate the effects of Aeolian vibration.
Follow these recommended steps to remove stains on aluminum poles.
Pole upkeep and inspection are important to achieve a pole’s full life expectancy.
Following the steps and procedures outlined in this document should make for a smooth installation of an embedded sports pole.
For proper technique and procedure for in-field paint touch ups.
United Lighting Standards has been committed to designing, fabricating, finishing, and packaging high-quality steel and aluminum poles since 1971. We adhere to standards set forth by AASHTO, ASTM International, and NEMA. All of our products are built using fabricating and welding procedures outlined in the American Welding Society (AWS) manual for steel and aluminum to eliminate welding defects and ensure structural integrity.
Read more about ULS